Procurement #67419



Title
Grand Lobby/Center Bar Audio Upgrade
Status
Archive
OpenDate
10/26/2018
CloseDate
11/07/2018
Description
Sealed bids are being solicited by Cherokee Nation Businesses, L.L.C. or the Cherokee Nation Businesses, L.L.C. wholly-owned entity identified in the attached Statement of Work (“Company”) to furnish labor and materials as specified in the Statement of Work.
Detail
Sealed bids are being solicited by Cherokee Nation Businesses, L.L.C. or the Cherokee Nation Businesses, L.L.C. wholly-owned entity identified in the attached Statement of Work (“Company”) to furnish labor and materials as specified in the Statement of Work. There will be a NON-Mandatory pre-bid meeting held on October 31, 2018 at 3:30PM CST at the Center Bar inside the Hard Rock Hotel & Casino located in Catoosa, OK. SEALED bids will be due no later than 2:00PM CST on November 7, 2018 and are to be delivered in accordance with the Bid Instructions; bidders are to include an electronic copy of their complete bid on a USB Thumb Drive. All proposals should be sent by express delivery, regular mail or hand delivery to Company’s Catoosa Corporate office at the following address, to be received no later than 2:00PM CST on November 7, 2018. IF BY EXPRESS DELIVER OR REGULAR MAIL Cherokee Nation Businesses, L.L.C. Attn: Tina Jones, Buyer IV 777 W. Cherokee Street Catoosa, Oklahoma 74015 IF BY HAND DELIVERY Cherokee Nation Businesses, L.L.C. Attn: Tina Jones, Buyer IV Corp. Building #3 1102 N. 193rd East Ave. Catoosa, OK 74015 The bidder must supply all the information required by the RFP Documents, hereinafter defined. Any proposal received more than ninety-six (96) hours, excluding Saturdays, Sundays and holidays, before the time set for the opening of proposals, or any proposal so received after the time set for opening of proposals, shall not be considered and shall be returned unopened to the proposing firm submitting same. The bidder must supply all the information required by the Contract Documents. Statement of Work Client: Cherokee Nation Entertainment (CNE) Job Name: Hard Rock Hotel & Casino Tulsa – Grand Lobby/Center Bar Audio Upgrade Summary The winning bidder will supply all parts and installation of the audio system for the Grand Lobby/Center Bar audio upgrade at Hard Rock Hotel and Casino, Tulsa. This includes, but is not limited to, pulling pertinent cable to designated locations, installing all audio equipment per CNE specifications, labeling, and testing all systems for proper functionality. Project Scope This SOW covers the following components, activities, deliverables and assumptions. Included in this will be hardware procurement, labor to install new equipment, removal of old equipment, programming, implementation, and testing. Vendors must provide cost breakout for the following: • Equipment • Installation CNE may award all or part of the above breakouts. Components: 1) Contractor Provided: With the exception of “CNE Provided” items in section two below, the procurement of all other parts is the responsibility of the contractor. 1a – Grand Lobby/Center Bar Description Symbol MFR MFR P/N QTY Notes Audio Amplifier QSC CXD 4.5Q 1 IDF 30 Dante Interface RDL RU-NL4P 1 IDF 30 Speakers JBL Control 47 C/T 10 White (C1) Speakers JBL Control 29 AV-1 4 White (Center Bar) Speakers JBL Control 19 CST 2 White (Center Bar) 2) CNE Provided Description Symbol MFR MFR P/N QTY Notes Equipment Rack CNE will provide all equipment racks DSP and Control System Programming CNE will provide DSP and control system programming 3) Miscellaneous – Contractor will provide all miscellaneous components to complete the install except the specific items listed in “CNE Provided” section above. This includes, but not limited to, cables, connectors, j-hooks, brackets, custom panels, labels, hardware, tie wraps, etc. a. Lift Rental – Contractor must provide any special lift or scaffolding needed to complete the installation. b. Painting Speakers – Contractor will coordinate any speaker painting with CNE • CNE will paint the speakers Tasks: 1) Installation – Contractor will install all necessary components and complete all tasks necessary for this project which include but are not limited to: • Gaming Audio – Casino 1 • Install amplifier in designated IDF room per CNE instruction (Rack is owner provided) • Verify that all existing pendant speakers in Casino 1 area are tapped at highest Wattage available. Ensure not to exceed 80% of amp channel power ratings • Install Center Bar amplifier and speakers in IDF per CNE instruction (4- Control 29AV-1, 2- Control 19 CST) – Provide three dedicated channels, one channel for (4) 29 AV and one channel for (2) 19 CST. • Install (10) Control 47 C/T additional ceiling speakers in drywall area between grand lobby and players club desk • Separate grand lobby and the lower ceiling area between grand lobby and players club and create additional zone • Conditions • Work schedule will be coordinated with CNE • Majority of work will be performed during overnight/early morning hours (12am – 8am) • System will be installed, programmed and switched over in phases to reduce the impact to the gaming floor • Contractor is required to produce an integration process plan that must be approved by CNE before beginning work • Contractor is responsible for keeping all work areas clean. • Contractor is responsible for re-dressing cabling in all areas related to audio upgrade • Cabling General - Contractor will install, terminate, and test all cabling needed to complete the project as detailed in the AV plans. • AV contractor is responsible for pulling/labeling/terminating cabling for the following equipment: 1. Speakers a. One speaker cable for 29 AV Mains b. One speaker cable for 19 CST subs 2. Audio Processors 3. Amplifiers • Equipment – Contractor is responsible for installing all components of the audio distribution system needed to complete the project. Label all equipment with appropriate names and network information as applicable. • Verify mounting heights of all wall-mounted equipment with CNE prior to installation. 1) Programming – • Programming will be provided by CNE – Winning bidder for procurement and installation will work with CNE programmer to perform final system tests. 2) Testing – Contractor will perform a complete system test to provide CNE verified certificate of compliance. 3) Training – Contractor will train CNE personnel on all system functions. Deliverables 1) All AV systems must be 100% complete. 2) Provide a Warranty Letter to include equipment and installation warranty dates. 3) Provide all equipment manuals, any associated software discs, and any unused components. 4) Source code - CNE will take ownership of all environment workspace, library, include, IR, module, and source code files. At time of final implementation and testing, all code will be loaded to CNE jump server, compiled and loaded to all devices from jump server. 5) As built documentation – CAD files to be in AutoCAD DWG format, text files to be in MS Word or MS Excel format, graphic files to be in PNG format. PDF prints of all documentation should be included with for distribution as needed. Key Requirements • Contract personnel doing work on site and/or remotely must have a current CNGC gaming license. • Contractor must have a CNE lift certification to use CNE lifts. (This is a no cost certification that is provided upon demonstration of proper lift use per CNE safety staff.) • Contractor has all necessary software tools to accomplish tasks associated with the project. • Contractor understands and agrees to late night and/or overnight working hours if required. • Specified Parts: • No substitutions allowed unless owner permission is provided in writing. Please note that winning bid(s) will be published. Cherokee Nation Entertainment, LLC (“CNE”) reserves the right to issue one award, multiple awards, or reject all bids; any award is subject to the approval of the required funds. Responding bidders are not allowed to withdraw their bid for a period of 90 days after submittal. At the time of award, the successful bidder(s) will be required to work with the Cherokee Nation Entertainment, LLC Accounting department to discuss account coding for invoices. All bids are subject to negotiation prior to award. Awards may be issued without discussion of bid received, and bids should initially be submitted on the most favorable terms from a price and technical standpoint. Any award resulting from this RFP will be subject to CNE Terms and Conditions. Your bid should indicate hourly ($) rate (when applicable), individual work effort, delivery schedule or time of completion. Any item(s) with exceptions, substitutions, exclusions, additions or qualifications must be noted and clearly indicated on return bid. Any request for information concerning bid posting is to be submitted in writing via email to Buyer listed; no verbal communication is to be initiated. In accordance with Cherokee Nation Law, , 28 C.N.C.A. §20 no contractors or subcontractors of any Cherokee Nation entity may contract with any business owned by a first degree relative of any elected official of the Cherokee Nation. TRIBAL EMPLOYMENT RIGHTS OFFICE - This procurement is subject to Cherokee Nation Tribal Employment Rights Office (“TERO”) regulations that include a fee of ½ of 1% of total contract award and, if applicable, the completion of a TERO Labor Agreement and payment of associated fees. The successful bidder’s award will be published on the Cherokee Nation’s procurement website and their performance will also be measured, recorded, and reported to the Cherokee Nation. The complete Act is available by contacting the TERO OFFICE at Tahlequah 918-453-5000. TERO bidders are required to provide a copy, front and back, of their TERO certificate with return bid(s) and failure to do so will result in such bidders not receiving the TERO preferences afforded TERO bidders under the CNE procurement and contracting policies and procedures. CHEROKEE NATION GAMING COMMISSION (CNGC) - This requirement WILL be subject to CNGC policies and procedures. Licensing requirements may be required of the successful vendor(s) to be coordinated with the CNGC. These requirements may include licensing fees as well security and background checks of vendor(s) employees. Current policies and procedures can be found on the Cherokee Nation website or by contacting the CNGC office at 918-207-3834. BONDING NOTICE - CNE generally requires payment and performance bonds for all contracts in excess of $100,000. However, qualified TERO-certified firms are encouraged to bid, regardless of bonding capability. INSURANCE - CNB generally requires Worker’s Compensation, Commercial and/or Comprehensive General Liability, and Automobile insurance for all awarded bids. Please refer to the Bid Documents for the specific coverages required for this bid. DEBARMENT - By submitting a response to this Request for Proposal, the Contractor certifies to the best of their knowledge and belief that the Subcontractor, the firm, or any of its principals are not presently debarred, suspended, or proposed for debarment by any federal, state, local or tribal entity. This certification is a material representation of fact upon which reliance was placed when making award. If it is later determined the Subcontractor rendered an erroneous certification, in addition to other remedies available to CNE or its entities, CNE may terminate the contract resulting from this Request for Proposal for default.
Name:Tina Jones
Email:tina.jones@cnent.com
Phone:918-384-7802
Cherokee Nation Entertainment
Awards
All Media Integration LLC